Monday, May 14, 2012

Mr. Huggins - May 14 - 17 B week

Only four days this week before Exams begin.

Medical Technology
       This week we will study Bacteria, Review and watch Planet Earth videos.

 Engineering Design 3rd       
        Toy Train Project. Students will create a wooden train having a Engine, two Cars and a Caboose. Students will design each part - Each part made in ISO part - Each part dimensioned then each part assembled in assembly drawings. This will probably take about 5 days. This should be finished by Tuesday this week and then students will Design and Draw a Bird house.
Multimedia
      Only five days of class left so we will work in our strand on research and review.
 
Engineering Design 4th B days
            Toy Train Project - we only have 2 days of  regular class left.  Students will probably have time to only design the Engine and Caboose. Train project will be graded Wednesday.
 
Friday we begin exams!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!